This section covers the details of equipments required for power supply for the infrastructure. Structured power distribution equipments with TNEB approval. Raw power & Generator power terminating to the UPS.
UPS
To support 80 workstations and servers the following UPS facilities have been installed
2 Nos. of 10 KVA UPS and 1 No. of 7.5 KVA UPS
These equipments can support the workstations and server for around 30 minutes to 1 hour.
Generator
The 62.5 KVA Generator to take care of the load for 48 hours.
Trained technician is available with ITIC for handling power issues & switching to Generator Power Supply.